Process

What happens after you get in contact.

Six steps, in order. The quote is fixed before any work starts.

The six steps

  1. 01

    Inspection

    We measure the footprint, read the framing with a pin meter, count piers and penetrations, and check clearance and the floor.

  2. 02

    Assessment

    The readings decide whether a liner is the right first job, and each finding is explained before a price is set.

  3. 03

    Fixed quote

    One figure for the scope we measured. It does not change on the day unless you change the scope.

  4. 04

    Preparation

    Debris, rubble and any old plastic come out; the floor is graded where it needs it.

  5. 05

    Installation

    Full coverage, sealed laps, every pier wrapped, every penetration collared, the wall sheet fastened along its top edge.

  6. 06

    Final documentation

    Photographs of your crawlspace, seams and terminations included, so you can check the standard against what was built.

Free inspection

Book your free inspection.

About an hour under the house, then one fixed price. Texts are answered right away.